ICMS (International Cost Management Standard) – A Global Standard for All Construction Professionals
Irish building contributor Mary Flynn, a 5D BIM Quantity Surveyor, in part one of a new series, discusses the impact ICMS will have on all construction professionals to varying degrees in compliance with the Government ICMS Mandate 2024. Mary is an ICMS Trustee for The European Council of Construction Economists (CEEC) and part of the SCSI ICMS working group, who co-authored a number of SCSI ICMS explanatory publications.
In this series, I hope to answer a number of questions such as: What is ICMS? Why should we use it? Do we have to use it? What does it replace? Where do we go for help and support in understanding ICMS? Where can I get carbon templates? Are there any college courses on ICMS? Does ICMS affect the engineers or the architects? Are there other documents within the ICMS suite? Why is ICMS described as a global standard? How did ICMS come about in the first place? What are the benefits of using ICMS? How does the Government BIM Mandate 2024 tie in with the ICMS Mandate 2024? Who are the ICMS Coalition?
What is ICMS and How Did it Come About?
Before the advent of ICMS, cost data was fragmented and lacked transparency, with different countries and organisations using different methods, making it very difficult to benchmark and compare projects internationally, and often nationally. So, to quote the often-used phrase, we couldn’t compare “apples with apples” — instead, we had a mixed bowl of fruit.
ICMS was conceived because there was no standardised framework for reporting costs across projects (ICMS 1), across the full project lifecycle – from inception to end-of-life (ICMS 2) – and to report on both cost and carbon (environmental impact) for sustainability integration, specifically carbon emissions (ICMS 3). Hence, ICMS was born.
The ICMS Coalition, which formed in May 2015, convened its first meeting at the International Monetary Fund (IMF) in Washington, DC, USA. Ireland, as one of the founding members, was represented by SCSI (Society of Chartered Surveyors) members. The SCSI was a founding member and this year marks the 10th anniversary. SCSI members, along with many of the coalition members from across the globe such as RICS, CIQS, and CEEC to name but a few, will be attending the anniversary meeting in the IMF headquarters in Washington, DC, once again.
The Coalition and the SSC are non-government, not-for-profit professional coalitions, whose purpose was to bring global structured consistency in construction (both building and civil) project reporting. The coalition comprises members from Africa, Australia, Canada, China, Brazil, New Zealand, Japan, all of Europe, Korea, India and many more, making up the original 49 global organisations.
ICMS is a high-level, globally recognised, principle-based international standard which provides greater global consistency in defining, classifying, grouping, measuring, analysing, presenting and reporting construction costs at a project, regional, national and international level. Put simply, it is comparing “apples with apples” right across the globe by providing a common reporting framework for the life-cycle cost of an asset. Globalisation of construction has increased the need for meaningful comparisons between countries, especially for global organisations such as the World Bank Group, the International Monetary Fund, the United Nations, as well as government and non-government organisations.
The ICMS Coalition comprises ICMS Trustees and the ICMS Standard Setting Committee and has made substantial progress over the last 10 years. It was a remarkable achievement of vision, collaboration and agreement by 49 globally prominent organisations in establishing a global benchmark and driving standardisation for cost and carbon management. Such collaborations are rare globally; one recent example would include the COVID-19 pandemic.
The first edition, ICMS 1, was published in 2017 and focused mainly on capital costs. Two years later, ICMS 2 followed in 2019, extending its scope to include lifecycle costs. The third edition, ICMS 3, was published in 2021 and recognised the importance of reducing greenhouse gas emissions in line with global climate change. This ground-breaking edition integrates both cost and carbon management in infrastructure.
The ICMS Coalition has grown to over 70 prominent global organisations over the years. The SSC is a dynamic coalition continuously improving the process by listening to and taking stock of the global construction performance management community, ensuring that necessary updates are captured for continuous improvement.
Adoption of the ICMS by the Irish Government & SCSI
The Irish Government adopted the ICMS Standard, mandating this global standard, which took effect from January 2024 and incorporated it into the CWMF (Capital Works Management Framework). ICMS was based on ISO standards as well as international best practice, and it takes account of BIM, which was also mandated from January 2024.
ICMS is also supported by the Government, professional bodies such as SCSI, industry and software, with the key drivers being digitalisation of the CWMF and utilising the data-handling capacity of Building Information Modelling. This cost reporting standard provides metrics around capital expenditure, operational expenditure and embodied carbon through ICMS/Level(s)/Climate Action Plan.
The Government also published the Infrastructure Guidelines for capital projects, which refer to the ICMS 3rd edition and the asset lifecycle. Bearing in mind that Ireland’s largest client of construction is the Government, which is currently paying circa €20m per year for carbon credits, it has a vested interest in cost and carbon accounting and ensuring value for money for the public purse. This is further underpinned by the “National Planning Framework, Project Ireland 2040”, “Housing for All” and the “Climate Action Plan”, which reference greening of public works.
The Government must also be cognisant of the requirement for national reporting of the Energy Performance in Buildings Directive (EU) 2024/1275 as well as the Energy Efficiency Directive (EU) 2023/1791 and, going forward, a host of other EU directives.
Following on from the ICMS Public Sector Mandate, the SCSI, being a founding coalition member, requires its members to utilise ICMS with public and private clients unless advised by a client to utilise a different standard.
Ireland has become the first global coalition member leading the way in implementing ICMS for both the private and public sectors, a remarkable achievement. ICMS is a game-changer in its own right along with BIM, another major game-changer. Combined, the effect is seismic for digitalisation and standardisation, propelling practitioners into the “data age” for the AEC sector. ICMS is coded for digitalisation and mapped to Uniclass, which is mandated for use under the 2024 BIM Mandate.
What Did the ICMS Standard Replace & Do We Have to Use It?
The ICMS standard replaced the National Standard Building Elements (NSBE), as they are more commonly known. The NSBE and Design Cost Control Procedures had been in use in Ireland since the 1970s and have now been replaced with ICMS 3 from January 2024.
The NSBE was based on a Nordic system and in many ways was similar to ICMS, so transitioning from NSBE to ICMS for Irish practitioners was relatively straightforward. The NSBE is now defunct and confined to the history books. Practitioners are now required to use ICMS on all new publicly funded projects going forward in line with the ICMS mandate of January 2024.
The new cost and carbon templates which have replaced the NSBE templates are available on www.constructionprocurement.gov.ie. Other templates and useful information are available on www.builddigitalproject.ie, where practitioners will find a useful ICMS 3 Explainer. For those who want to know more about ICMS, visit www.scsi.ie.
The SCSI, in conjunction with the RIAI and EI, is holding a free cross-discipline hybrid collaborative ICMS event at SCSI HQ on the 23 October 2025. This will be well worth attending. If you want to know more about ICMS, apply for your free tickets now.
As a practitioner on private projects, the SCSI requires its members to use ICMS unless directed otherwise by a client. The SCSI has produced a range of helpful documents to assist its members in transitioning to ICMS, and these are all available free on the SCSI website (www.scsi.ie).
The SCSI ICMS have published a very user-friendly guide for the International Cost Management Standard 3 (ICMS 3), specifically for the Irish jurisdiction, which is a must-read if you want to know more.
ICMS is part of a suite of global standards comprising ICMS, IPMS (International Property Measurement Standards: All Buildings) and ILMS (International Land Measurement Standard: Due Diligence for Land and Real Property Surveying). These three Coalition standards work in harmony with each other and encompass the whole built environment – an amazing global accomplishment of collaboration and standardisation.
Users of ICMS need to be aware that it refers to IPMS regarding the calculation and measurement of areas.
What are the Benefits of Using ICMS?
The use of these three global standards affects all construction professionals, from QSs, facility managers, geospatial surveyors, rural surveyors, building surveyors and every other class of surveyor, to architects, engineers, project managers and beyond, no matter the discipline. Quantity surveyors and civil engineers are most affected by ICMS because of their cost reporting functions, while land surveyors are most affected by ILMS. All three standards are interlinked with the procurement, construction, operation and decommissioning of infrastructure.
Using ICMS offers a wide range of advantages to all users, including FDI asset holders (foreign direct investors) as they operate in a global world. It brings standardised global consistency, transparency and comparability for reporting construction and lifecycle costs across jurisdictions. It allows for meaningful cross-border benchmarking on project costs and carbon emissions nationally and internationally.
It allows for improved confidence because of the structured, clear categorisation and transparency of costs, broken down into acquisition, construction, renewal, operation, maintenance and lifecycle across projects and across countries. ICMS allows for better decision-making for feasibility and investment analysis, as clients can make informed decisions regarding design, procurement and financing.
ICMS provides a comprehensive scope for construction costs and long-term operational and environmental impacts, thus allowing clients to meet sustainability goals by tracking cost and carbon. ICMS supports digital integration using BIM and AI for seamless integration across the project lifecycle.
ICMS has evolved and is applicable to all classes and presently has 19 project-type asset classes, from buildings to refineries, ports, tunnels to offshore structures. ICMS supports multiple use cases including cost planning, tender analysis, insurance valuations, claims analysis, forensic cost reviews and much more. ICMS brings accountability and is essential in assisting clients to make smarter long-term decisions and take a broader, more strategic view on their investments.
In part 2 of this series, Mary will discuss more on ICMS and its implementation within the Irish AEC sector.
This article first appeared in Irish building magazine, click here to view.
Follow Irish building magazine on LinkedIn for the latest news and updates.
